💬

BOQ & Billing: Measurement Sheet (M-Book) bharne ka sahi tareeka 📊

BOQ & Billing: Measurement Sheet (M-Book) bharne ka sahi tareeka 📊

Billing ek Site Engineer ki job ka sabse critical hissa hai. Agar aapne kaam achha kiya lekin measurement mein galti kar di, toh financial loss ho sakta hai.

Aaj hum seekhenge ki Measurement Sheet (M-Book) kaise sahi tarike se fill karein.


1. Measurement Sheet (Abstract) Kya Hai?

Measurement Sheet ek document hota hai jisme completed work ki quantity record hoti hai. Isi ke basis par contractor ko payment milti hai.

Standard Columns:

  • Description (Kaam ka naam)
  • Nos (Number of items)
  • Length, Width, Height
  • Quantity

2. Deduction Rules (Sabse important)

  • Brickwork: Door/window openings ka deduction zaroor karein
  • Plaster:
    • 0.5 m² se chhota → No deduction
    • 0.5–3 m² → Single side deduction

Reference: IS 1200 (Methods of Measurement)


3. Units of Measurement

  • Earthwork / Concrete → m³
  • Plaster / Painting → m²
  • Steel → kg / tonne
  • Skirting → Running Meter (RMT)

4. Reconciliation (Material Control)

Reconciliation ka matlab hai material consumption check karna.

Example: Agar 100 cement bags expected the aur 120 use hue, toh 20 bags ka difference analyze karein.


5. Joint Measurement (JMC)

  • Client ke saath measurement karein
  • Dono party ke signatures zaroor lein
  • Dispute avoid hota hai

📊 Common Billing Formulas

Item Unit Formula
Excavation L × B × D
Slab Concrete L × B × Thickness
Plaster L × H (Both sides)
Tiles Room area

🎯 Conclusion

Billing mein master banne ke liye IS 1200 ki knowledge bahut zaroori hai.

Jitni clear aapki calculation hogi, utna fast aapka bill pass hoga.


💬 Aapka Sawal

Kya aapko Excel par billing sheet banane mein problem aati hai? Comment karein — agla article Excel par hoga!

Comments